Municipal Engineering Office Citizen's Charter
Services
Contact Us
Tel. No.: (032) 263-1196
Email: sanfernandoengg@gmail.com
Securing a Building Permit
- Schedule of Availability – Monday to Friday, 8:00 A.M. – 5:00 P.M.
- Who May Avail of the Service – Eligible Client / Filipino Citizens
What are the Requirements:
I.
- Five (5) copies of filled-up Application Form
(any of the following):- Notarized Building Permit Application Form
- Architectural Permit Application Form
- Structural Permit Application Form
- Electrical Permit Application Form
- Electronics Permit Application Form
- Sanitary Permit Application Form
- Fencing Permit Application Form
- Mechanical Permit Application Form
- Sign and Sealed by the Licensed Designed Professional
- For Structural (CIVIL ENGINEER)
- For Architectural (ARCHITECT)
- For Electrical (PROFESSIONAL ELECTRICAL ENGR)
- For Electronics (ECE)
- For Plumbing (MASTER PLUMBER/SANITARY ENGR.)
- For Mechanical (PME)
- Fencing (CE &Ar.)
- Five (5) copies of Detailed Estimated/Bill of Materials & Specifications of the building
- Five (5) sets of Design Plans
- DPWH Highway Clearance (if along the National Road)
- Three (3) photocopies – Sketch Plan of Lot (Duly Signed by Geodetic Engineer)
- For Two Storey Building & Above:
- Structural Design & Analysis signed by
Structural Engr. - Architectural Permit Application Form and
Structural Permit Application Form – 2 Copies
- Structural Design & Analysis signed by
- For Three Storey Building & Above:
- Structural Design & Analysis signed by
Structural Engr. and - Geotechnical Investigation Report (Soil Test)
- Structural Design & Analysis signed by
II.
- Barangay Clearance (for Building Permit Purpose)
III.
- Three (3) photocopies of Original Certificate of Title (OCT) / Transfer Certificate of Title (TCT),
or Deed of Absolute Sale or (if lessee, Contract of Lease), Proof of Ownership, Consent to Construct on Lot,
if not the Owner provide Special Power of Attorney (SPA)+ - Three (3) photocopies -Latest Tax Clearance of Lot or Real Tax Property Receipt/Bill
- Three (3) photocopies -Valid ID/ Identification Card of the Applicant and the Lot Owner
- Three (3) photocopies – Community Tax Certificate (CEDULA)
Steps, guides & procedures
Steps/Procedure |
Processing Time |
Person in Charge |
||||
For complete requirements, please submit documents first to MPDC for evaluation and get your order of payment for Locational Clearance Fees. |
|
MPDC Office |
||||
Proceed to Office of the Building Official (OBO) for inspection and get your order of payment |
1 hour |
Engr. John Kent M. Lauronal, Mun.Engr. |
||||
Pay at the Treasurer’s Office |
|
Municipal Treasurer’s Office |
||||
Present official receipt at MPDC and in OBO/Engineering Office to get your Fire Endorsement Letter, proceed to Municipal Fire Station |
15 minutes |
George Krympson Fisalbon April Therese Genobaten |
||||
Return to the OBO and present the Fire inspection Certification and all Requirements stated above for checking and receiving |
1 hour |
Arnel Alvarico Ar.Sheila Annavie Alkuino |
||||
Release the approved Building Permit |
15 minutes |
Ar.Sheila Annavie Alkuino Arnel Alvarico |
||||
End of Transaction |